• Panoramic padel court with simple roof H007R complete isometric view showing 20×10m FIP-compliant court layout, hot dip galvanized heavy structural steel frame, integrated simple roof steel structure on court foundation, 12mm tempered glass EN 12150-1 panoramic panels, and LED floodlight array in covered outdoor sports club or resort context
  • Padel court H007R simple roof steel structure assembly showing hot dip galvanized roof rafter and purlin framing, roof-to-court perimeter frame integration at foundation anchor points, and structural steel canopy geometry above 20×10m court footprint during installation phase
  • Close-up of H007R padel court 12mm tempered glass EN 12150-1 panel edge detail beneath the simple roof canopy line, showing 5mm neoprene anti-vibration gasket layer at the glass-to-frame interface under covered roofed court configuration
  • Panoramic padel court H007R with simple roof installed at outdoor hotel or luxury resort facility, showing complete hot dip galvanized steel frame and roof canopy structure, 12mm EN 12150-1 glass perimeter panels, EN 12193 LED floodlights, and covered court positioned in coastal or resort landscape site context
  • Close-up of padel court H007R 12mm pile height artificial turf surface under covered simple roof configuration, showing consistent fiber texture and density, and available color options (blue, green, purple, red, grey, yellow) on covered padel court playing surface
  • Panoramic padel court with simple roof H007R complete isometric view showing 20×10m FIP-compliant court layout, hot dip galvanized heavy structural steel frame, integrated simple roof steel structure on court foundation, 12mm tempered glass EN 12150-1 panoramic panels, and LED floodlight array in covered outdoor sports club or resort context
  • Padel court H007R simple roof steel structure assembly showing hot dip galvanized roof rafter and purlin framing, roof-to-court perimeter frame integration at foundation anchor points, and structural steel canopy geometry above 20×10m court footprint during installation phase
  • Close-up of H007R padel court 12mm tempered glass EN 12150-1 panel edge detail beneath the simple roof canopy line, showing 5mm neoprene anti-vibration gasket layer at the glass-to-frame interface under covered roofed court configuration
  • Panoramic padel court H007R with simple roof installed at outdoor hotel or luxury resort facility, showing complete hot dip galvanized steel frame and roof canopy structure, 12mm EN 12150-1 glass perimeter panels, EN 12193 LED floodlights, and covered court positioned in coastal or resort landscape site context
  • Close-up of padel court H007R 12mm pile height artificial turf surface under covered simple roof configuration, showing consistent fiber texture and density, and available color options (blue, green, purple, red, grey, yellow) on covered padel court playing surface

Panoramic Padel Court With Simple Roof H007R

No.H007R
H007R roofed padel court: 20×10m FIP, hot-dip galvanized steel + integrated simple roof, 12mm EN 12150-1 glass, LED 200W/400W. Turnkey 6–8 weeks.
  • Panoramic padel court with simple roof H007R complete isometric view showing 20×10m FIP-compliant court layout, hot dip galvanized heavy structural steel frame, integrated simple roof steel structure on court foundation, 12mm tempered glass EN 12150-1 panoramic panels, and LED floodlight array in covered outdoor sports club or resort context
  • Padel court H007R simple roof steel structure assembly showing hot dip galvanized roof rafter and purlin framing, roof-to-court perimeter frame integration at foundation anchor points, and structural steel canopy geometry above 20×10m court footprint during installation phase
  • Close-up of H007R padel court 12mm tempered glass EN 12150-1 panel edge detail beneath the simple roof canopy line, showing 5mm neoprene anti-vibration gasket layer at the glass-to-frame interface under covered roofed court configuration
  • Panoramic padel court H007R with simple roof installed at outdoor hotel or luxury resort facility, showing complete hot dip galvanized steel frame and roof canopy structure, 12mm EN 12150-1 glass perimeter panels, EN 12193 LED floodlights, and covered court positioned in coastal or resort landscape site context
  • Close-up of padel court H007R 12mm pile height artificial turf surface under covered simple roof configuration, showing consistent fiber texture and density, and available color options (blue, green, purple, red, grey, yellow) on covered padel court playing surface

Description

Technical Specifications

Parameter Value
Product Designation Panoramic padel court with simple roof H007R
Court Layout Dimensions 20 m × 10 m (200 m² total perimeter area)
Dimensional Standard FIP dimension standard
Structural Frame Heavy structural steel profiles
Anti-Corrosion Treatment Hot dip galvanized system
Overhead Canopy Simple roof steel structure; permanently integrated into court foundation
Glazing Panel Material 12 mm tempered glass
Glazing Safety Standard EN 12150-1
Glazing Configuration Panoramic
Vibration Isolation Neoprene gaskets 5 mm anti-vibration damping layers
Net Post Dimensions 50 mm / 100 mm × 3 mm steel
Net Type Options Knotted net / knotless net
Artificial Turf Pile Height 12 mm
Turf Color Options Blue, green, purple, red, grey, yellow
LED Floodlight Options 200 W / 400 W
Illumination Standard EN 12193
Compliance Certifications FIP dimension standard, EN 12150-1, EN 12193, CE marks
Installation Timeframe Turnkey installation 6–8 weeks (inclusive of complete roof assembly)
Venue Application Outdoor and indoor application
Company Experience 10+ years
Export Markets Global

Key Features & Benefits

  • Integrated simple roof steel structure permanently anchored into the court foundation converts the padel court from an open-air installation to a covered all-weather facility within the same 20×10m FIP-compliant footprint — eliminating weather downtime and extending the operational hours and seasonal availability of the court without requiring a separate roofing structure procurement or installation phase.
  • Hot dip galvanized heavy structural steel frame on both the court perimeter and the roof structure deposits a metallurgically bonded zinc alloy layer across all steel surfaces, providing cathodic corrosion protection for covered outdoor installations in humid, coastal, and tropical environments where the roof structure's extended overhead exposure accelerates corrosion risk relative to ground-level frame elements.
  • 12mm tempered glass panels certified to EN 12150-1 at the court perimeter provide the European structural safety standard for thermally toughened soda lime silica glass in public assembly sports facilities — the panoramic configuration maximizes sightlines from outside the court and natural light penetration under the roof canopy, relevant for resort and hotel facility aesthetics alongside the structural safety requirement.
  • 5mm neoprene gaskets at all glass-to-frame interfaces absorb differential thermal expansion and dynamic ball impact vibration between the glass panels and the steel structural frame — particularly relevant under a roofed configuration where the enclosed microclimate may produce higher thermal cycling amplitude at the glass-to-frame boundary than an open-air court installation.
  • FIP dimension standard compliance at 20×10m confirms the court meets the Federación Internacional de Pádel dimensional requirements for official competition play — the covered roof configuration extends this compliance to all-weather and evening competition scenarios that open-air courts cannot support, broadening the facility's tournament hosting capability.
  • Turnkey installation in 6–8 weeks inclusive of complete roof assembly covers the full project workflow from delivery to operational roofed court handover — the single timeframe covering both court and roof assembly reduces procurement complexity relative to managing court and roofing as separate subcontracted scopes.

Applications

  • Installed at all-weather commercial sports club developments where the integrated simple roof extends the daily and seasonal operational window of the padel court, EN 12193 LED illumination supports evening programming, and FIP compliance supports tournament hosting across all weather conditions.
  • Deployed at luxury resort outdoor facility upgrades where the panoramic 12mm tempered glass configuration combined with the simple roof canopy delivers a covered, visually open court environment suited to resort guest experience standards, and the hot dip galvanized frame sustains structural integrity in coastal resort environments.
  • Specified for premium hotel leisure court design where the 6–8 week turnkey installation timeline inclusive of roof assembly provides a defined project schedule for hotel facility authority approval, soft-opening planning, and guest program launch — avoiding the schedule uncertainty of managing court and roof as separate procurement packages.
  • Used in municipal public multi-sport parks where CE mark certification, FIP compliance, and the covered roof structure extend the court's usable hours and seasonal availability for public programming, while the 6 turf color options allow the court to be visually integrated into existing park landscape design.
  • Deployed at high-tier competitive padel training hubs where all-weather court availability enabled by the integrated roof is a performance program prerequisite, EN 12193 compliant LED illumination supports year-round early morning and evening training schedules, and FIP dimension compliance maintains training conditions consistent with competition circuit standards.

FAQ

Q1: What does the 6–8 week turnkey installation timeline cover, and does it include the complete roof assembly?
The 6–8 week turnkey installation timeframe is confirmed as inclusive of the complete roof assembly, covering the full project workflow from delivery to operational roofed court handover. Procurement teams should use this as the planning schedule for facility authority permitting, site preparation, and program launch coordination, since the timeline begins from confirmed delivery to site.


Q2: What structural weather and climate performance does the integrated simple roof and hot dip galvanized frame provide?
The simple roof steel structure is permanently integrated into the court foundation with hot dip galvanized anti-corrosion treatment applied to all steel frame and roof structure surfaces. Hot dip galvanization provides cathodic corrosion protection across both the perimeter court frame and the elevated roof steelwork; specific zinc coating thickness, salt spray resistance hours, and coastal environment service parameters are not confirmed in the current brief and should be requested from the manufacturer for site-specific climate specification.


Q3: What do EN 12150-1 glass certification and 5mm neoprene gaskets provide under the roofed configuration?
EN 12150-1 certifies the 12mm tempered glass panels as thermally toughened safety glass meeting European structural standards for public sports facility glazing, confirming fracture behavior under impact. The 5mm neoprene gaskets absorb differential thermal expansion and ball impact vibration at the glass-to-frame interfaces — under the roofed configuration, the enclosed microclimate may increase thermal cycling amplitude at the glass boundary, making the neoprene isolation layer structurally relevant beyond its role in open-air court formats.


Q4: How should buyers select between 200W and 400W LED floodlights, 12mm turf, and knotted versus knotless nets for the roofed court?
LED floodlight selection (200W or 400W) should be based on the target EN 12193 illuminance level for the intended competition classification and use schedule — under a roofed configuration, canopy shading reduces ambient light contribution, which may shift the selection toward the 400W option for evening and covered-daylight play; buyers should request the manufacturer's illuminance calculation for both options. Turf pile height is confirmed at 12mm; net selection between knotless and knotted follows durability and ball rebound preference, with knotless generally providing longer fiber life.

Get a Quote